Bridge Prep Academy Green Village Miami | GC: PF Management & Construction

0.1 Project Scope

ACG Glass & Metals supplied and installed the restroom vanity mirrors at Bridge Prep Academy Green Village in Miami, working with PF Management & Construction as general contractor.

Each mirror is cut from 1/4″ clear first grade mirror and glued directly to the wall over the multi sink vanities, resting on the backsplash. There is no frame, so the mirrors read as one clean reflective band across the full length of each counter.

Corner seal was applied to protect the mirror edges against black edge, a common issue in high humidity restrooms. The project included two pieces at approximately 94″ x 36″ and two at approximately 82″ x 36″, all verified in field before fabrication.

Included Services
Field verified measurements
1/4 inch clear first grade mirror
Mirror panels cut to vanity length
Adhesive wall mounting
Installed resting on the vanity backsplash
Corner seal for black edge prevention
Frameless finish with no cutouts
Professional commercial installation
PROJECT DATA
CLIENT
LOCATION
COMPLETION DATE
October 12, 2026
SYSTEM TYPE

Restroom Vanity Mirrors

PROJECT VALUE

$3K-4K

Image link

Technical Specifications

Engineering Data & Component Detail

GLASS TYPE
1/4" Clear 1st Grade Mirror
SYSTEM
Frameless Glued Vanity Mirrors
MOUNTING
Glued to Wall, Resting on Backsplash
EDGE PROTECTION
Corner Seal Against Black Edge
PANEL SIZES
2 @ 94" x 36" and 2 @ 82" x 36" Approx.
APPLICATION
School Restroom Vanities

| Gallery

Rated 5/5 in 310+ reviews

See what people
are talking!

Portfolio

Check out our latest work