Curtain wall
for South Florida buildings
A skin hung off the structure, not a wall that carries it
- Aluminum framing anchored back to the slab edge or the structural frame
- One grid that runs continuously past every floor line
- Vision glass and opaque spandrel panels carried in the same framing
- A Florida Product Approval or a Miami-Dade NOA for the tested assembly
Two decisions set the price and the schedule
Assembled on the building
Assembled in the shop
Pressure plate and cover cap
Flush glass, no cover cap
The unit arrives finished and gets hung
Every assembly ships with its approval number
Florida Product Approval
Miami-Dade Notice of Acceptance
HVHZ is Miami-Dade and Broward
Offices, hotels, lobbies and entrances
Drawings first, dimensions from the building, closeout that clears
Takeoff and budget
Shop drawings and anchors
Approvals to the permit set
Field survey before fabrication
Fabrication and supply
Water testing and closeout
Eight manufacturers, one point of contact
Commercial glazing we have finished
Everything your precon team asks for, in one packet
- Certificate of insurance, issued to your entity
- W-9 and Florida license SCC131154568
- Project references with general contractor contacts
- Shop drawings and product approvals per opening
- Commercial bids from 48 hours, residential estimates same day
Curtain wall, answered
What is the difference between a storefront and a curtain wall?
Where the load goes. A storefront sits inside one opening and bears on the floor, so it is a one story product. A curtain wall hangs off the structure and runs continuously past the slab edge, so a single grid can cover a whole elevation. The anchors, the movement joints and the cost per square foot all follow from that.
Stick built or unitized?
Stick is cheaper to ship and slower to erect, and it suits low and mid rise or an elevation that changes as it goes up. Unitized is faster on the building and less exposed to weather, and it needs a repetitive elevation, crane access and a longer lead time. It is worth pricing both before the schedule is fixed.
Who is responsible for the anchors and the embeds?
The anchor design is ours and it goes on our shop drawings. The embeds and the slab edge condition belong to the structure, so they get coordinated with your structural engineer early. An embed that is missing after the pour is an expensive fix.
What is the difference between a Florida Product Approval and a Miami-Dade NOA?
Both approve a tested assembly. The FL number is the statewide route. The Miami-Dade NOA is tested to the TAS protocols and is required inside the High Velocity Hurricane Zone. An NOA is accepted anywhere in Florida.
Do you work inside the High Velocity Hurricane Zone?
Yes. The HVHZ is Miami-Dade and Broward, and we have finished glazing packages in both, at Bal Harbour Shops and in Hallandale Beach. Inside the zone the assembly needs a Miami-Dade NOA.
How fast can you turn a bid around?
Commercial bids go out from 48 hours once we have the elevations and the glazing schedule. If a package is large or the drawings raise questions we will tell you the date we can hit rather than let it slip quietly.
Do you supply and install, or install only?
Either. Most jobs are supply and install, which is where we can hold the schedule. If the system is already bought we will install to it, but we will want to see the approval first.
Send plans, get a real number
- 7830 Byron Dr Ste 4, West Palm Beach, FL 33404
- (561) 584-8485 · Monday to Friday, 8am to 5pm
- [email protected]
- Licensed and insured, FL SCC131154568





