Currie Park West Palm Beach | GC: West Construction

0.1 Project Scope

ACG Glass & Metals is building the storefront package for the Currie Park Redevelopment on North Flagler Drive in West Palm Beach, working with general contractor West Construction. The new waterfront park on the Intracoastal includes several park buildings, and every exterior opening is designed in impact glass.

The exterior storefronts use ES Windows 8000T frames and ES Windows 9000 doors, glazed with clear Solarban 70XL insulated laminated impact glass, with frames in AAMA 2605 bronze per the project specifications. The package also includes ES Windows EL200 horizontal rollers, a EuroWall C3 bi-folding door and Trulite CG450 interior storefronts.

These drone photos show the buildings in structural steel, before glazing, and our team taking field measurements on the slab. We will add photos to this project as each building is closed in.

Included Services
Shop drawings and submittals
Final field measurements
ES Windows 8000T exterior storefronts
ES Windows 9000 storefront doors
ES Windows EL200 horizontal rollers
EuroWall C3 bi-folding door
Trulite CG450 interior storefronts
Professional installation
PROJECT DATA
CLIENT
LOCATION
STATUS

In Progress

SYSTEM TYPE

Impact Storefronts and Doors
Interior Storefronts

PROJECT VALUE

$400K-500K

Image link

Technical Specifications

Engineering Data & Component Detail

Glass Type
Solarban 70XL Insulated Laminated Impact
Storefront
ES Windows 8000T Series
Doors
ES Windows 9000 Series
Folding Door
EuroWall C3 Bi-Fold
Frame Finish
AAMA 2605 Bronze
Interior
Trulite CG450 Storefront